MLV Series
- Fully deployed heights of 10, 15, 20, 30 and 34 m
- Heavy duty composite sectional tripod masts capable of supporting top loads up to 130 kg *
- Comprises individual glass or carbon fibre composite sections that fit together to give the desired height
- The mast packs down to a compact kit allowing stowage in smaller vehicles or shelters
- The tripod includes a manual or electric lifting mechanism and hoist to raise each section
- Telescopic tripod legs allow deployment on uneven ground
- Tripod has a kneeling position to allow easy access to the top load
- Guy wires are manufactured from either steel wire or aramid rope
- Central guying system enables the guy tension to be maintained by a single operator during deployment of the mast
- Requires 2 or 3 operators to deploy the mast even in high winds
- The mast is supplied with all accessories required for field deployment
- Bracketing available to support installation of equipment at any height
- Suitable for supporting heavy headloads such as directional and omnidirectional antennas, optronic equipment, lighting etc
- 360 degree azimuth rotation from the ground to orientate the top load
* Typical values shown. Actual values will be subject to a combination of top load weight, top load area and pointing accuracy required.
REQUEST A QUOTE
Model | MLV 125/10-1.6 | MLV 125/15-1.6 | MLV 125/20-1.6 | MLV 125/30-1.6 | MLV 125/34-1.6 |
---|---|---|---|---|---|
Height | 10 m | 15 m | 20 m | 30 m | 34 m |
Tube Diameter | 125 mm | 125 mm | 125 mm | 125 mm | 125 mm |
Mast Section Length | 1.6 m | 1.6 m | 1.6 m | 1.6 m | 1.6 m |
Maximum Headload* | 130 kg | 130 kg | 130 kg | 130 kg | 130 kg |
Maximum Wind Speed | Deployment: 60 km/h Operational: 100 km/h Survival: 150 km/h |
Deployment: 60 km/h Operational: 100 km/h Survival: 150 km/h |
Deployment: 60 km/h Operational: 100 km/h Survival: 150 km/h |
Deployment: 60 km/h Operational: 100 km/h Survival: 150 km/h |
Deployment: 60 km/h Operational: 100 km/h Survival: 150 km/h |
Total Kit Weight | 165 kg | 185 kg | 220 kg | 260 kg | 270 kg |
Top Load Interfaces Available | 40 mm spigot 50 mm spigot Vee Ring Adaptor |
40 mm spigot 50 mm spigot Vee Ring Adaptor |
40 mm spigot 50 mm spigot Vee Ring Adaptor |
40 mm spigot 50 mm spigot Vee Ring Adaptor |
40 mm spigot 50 mm spigot Vee Ring Adaptor |
Temperature Range | – 40°C to + 55°C | – 40°C to + 55°C | – 40°C to + 55°C | – 40°C to + 55°C | – 40°C to + 55°C |
Anchoring | 3 locations at 120° | 3 locations at 120° | 3 locations at 120° | 3 locations at 120° | 3 locations at 120° |
Guy Radius | 8 m | 10 m | 16 m | 25 m | 27 m |
Guying Levels Stainless Steel Wire |
Two levels | Two levels | Two levels | Four levels | Four levels |
Standard Colour | IR-NATO 24×5 Army Green Other colours available on request |
IR-NATO 24×5 Army Green Other colours available on request |
IR-NATO 24×5 Army Green Other colours available on request |
IR-NATO 24×5 Army Green Other colours available on request |
IR-NATO 24×5 Army Green Other colours available on request |
Number of Operators | 2 | 2 | 2 | 3 | 3 |
Setup Time | 20 minutes | 25 minutes | 30 minutes | 40 minutes | 45 minutes |
* Typical values shown. Values may vary subject to a combination of top load weight, top load area and pointing accuracy required.